EN

EN

EN

EN

banner-hero banner-hero banner-hero
s1 s1 s1
《绿色绕油田》袁建摄_20130326摄于吴起白河采油队 s2 s2
banner-01 10.杨凌液化天然气(LNG)应急储备调峰工厂 10.杨凌液化天然气(LNG)应急储备调峰工厂
We Drive the World Forward with Energy
We are a leading, independent oil trading firm at the forefront of the world's energy markets.
    原油储备库 原油储备库

    About Us

    Yanchang Petroleum Group (Hong Kong) Co., Ltd. (referred to as "Yanchang Hong Kong") was established in May 2010. It is a wholly-owned subsidiary of Shaanxi Yanchang Petroleum (Group) Co., Ltd. (referred to as "Yanchang Petroleum") registered in Hong Kong.

    Founded in

    2010

    Ranked

    257

    among the to 500 companies

    Total Assests At The End Of The Year

    476

    billion yuan

    We Have

    102,000

    employees

    sea sea sea

    Latest News

    Learn More
    virtual_attach_file

    Go all out to achieve the 15 billion cubic meters target

    As of June 11, 2025, the Gas Field Company has cumulatively produced 5.365 billion cubic meters of natural gas, achieving 45.5% of the annual production target of 11.8 billion cubic meters, representing a year-on-year increase of 27.32%. The Central-Southern Production Capacity Construction Project Department has completed 75% of the overall progress and is expected to prematurely accomplish the Natural Gas Production Capacity Doubling Project with an annual output of 15 billion cubic meters by the end of June.   On June 11, entering the Production Dispatching Center of the Gas Field Company, operators closely monitored the fluctuating production data on the screens. The production and construction data of each production unit on the large screen were particularly prominent, with daily updates on output figures, gas well "three rates", maintenance progress, well construction tasks, etc. Notably, the daily natural gas output reached 31.62 million cubic meters, 0.97 million cubic meters above the plan, stably achieving the daily output and laying a solid foundation for the company to achieve the "hard half-way" target of both time and tasks.   Since the beginning of this year, the Gas Field Company has unswervingly promoted the implementation of the "four focuses and one strict" management requirements for well construction operations, paid close attention to on-site quality control of well construction and technical measure operations. With a cumulative 2,868 well inspections, 181 category-I issues identified and rectified, and 446 tons of unqualified materials returned, the company has ensured the quality of well construction operations through practical actions. Meanwhile, in accordance with the production principle of "drilling exploration wells first, gas testing and connection wells prioritized", it has strictly implemented time-limited management for well construction operations, promptly solved existing problems, and coordinated the progress of operations. Currently, a total of 176 wells have been completed and 146 wells have undergone gas testing, with the company's well construction tasks proceeding exactly on schedule.

    11 Jun 2025

    virtual_attach_file

    Mining Company's first shipment of 50,000 tons of imported coal arrives at port in 2025

    03 Jun 2025

    virtual_attach_file

    Symposium between Yanchang Petroleum and Haier Group

    28 May 2025

    virtual_attach_file

    First Truckload of High-purity Helium Successfully Exported

    13 May 2025

    virtual_attach_file

    The first 3D seismic acquisition project of Yanchang Petroleum Group in Xinjiang officially starts

    19 Mar 2025